What SB 326 Requires of
Martinez Condo Associations
Martinez, the Contra Costa County seat, sits on the Carquinez Strait with many homes and condo buildings set into hillsides. That terrain shapes balcony inspections here: a walkway that is at ground level on the uphill side of a building can be well over six feet in the air on the downhill side, which brings it under SB 326 (Civil Code §5551).
SB 326 (Civil Code §5551) applies to condominium associations with buildings of three or more units. A licensed structural engineer, civil engineer or architect must inspect a random, statistically significant sample of the wood-supported balconies, decks, stairways and walkways more than six feet above the ground, along with their waterproofing, at least every nine years. The findings go to the board and into the reserve study.
For the full requirements, see our SB 326 inspection overview.
Need Repairs After Inspection?
We’ve Got You Covered.
If your SB 326 inspection reveals issues, we’ll refer you to our trusted sister company, Good Life Construction, experts in HOA compliance repairs. Fast, professional work — no stress.
Wind, Slopes and What They Do to Elevated Elements
Wind funnels through the Carquinez Strait and drives winter rain sideways into the joints where balconies, walkways and stairs meet the building. Flashing that would hold up in a calmer spot gets tested hard here, and wind-driven water often shows up first as staining at soffits and soft wood around door thresholds.
On sloped sites, tall exterior stairways and long elevated walkways carry more of the load and are harder to see from the ground. We check their framing, landings and railing attachment closely, because these are the elements residents use every day.
What We Check in Martinez
- Downhill-side walkways and decks that cross the six-foot line
- Wind-exposed flashing and door thresholds on the strait-facing side
- Tall stair stringers, landings and their supports
- Guardrail and handrail attachment on long elevated runs
After the Inspection in Martinez
Your board receives the report, and the findings go into the reserve study. If a condition is an immediate threat to safety, a copy must go to the City of Martinez within 15 days, and the association must restrict access to that element until repairs are approved. The city's Building Division runs a balcony hazard reporting process for exactly these SB 326 cases.
Structural repairs usually need a city building permit. Our report lists findings by priority so your manager can scope permits and bids without guessing.
How We Inspect Martinez Properties
- Scope and free quote, including the sample size.
- Site visit in Martinez, with moisture meters, infrared imaging and borescope cameras for framing that is hard to see.
- Report signed by our licensed engineer, usually within 1–3 business days of the visit.
- A walkthrough of the findings with your board or manager, and a plan for anything urgent.
SB 326 Inspection Cost in Martinez
Most small and mid-size Northern California associations pay roughly $1,500 to $5,000 per building; large communities are priced by the number of elements in the sample. Every Martinez quote is free and in writing.
Serving Martinez and Nearby Cities
Why Martinez HOAs Choose Us
- Licensed engineer on staff signs every SB 326 report
- Friendly, HOA-focused communication
- Knowledge of city-specific reporting standards
- Reports designed for easy board review
- 500+ inspections completed across California
Our Balcony
Inspectors
Martinez SB 326 Inspection FAQ
Schedule Your Martinez
SB 326 Inspection
Call (916) 550-3055 (Monday–Friday, 8:00 AM–5:00 PM) or request an inspection online. Tell us the number of buildings and elevated elements, and we will reply with a written quote.




